Luis Building
0

Luis Building 1321 Richards – Vanmar Contractors
Originally an exposed concrete topping was poured in place that was not up to the owners standards.
System One Floor Solutions met on site to review Vanmar’s client concern(s) about the finish. System One Floor Solutions Inc. was able to install a cementitious micro topping that solved both the visual aesthetic and Vanmar’s concern about raising the current floor elevation.
Materials – Ardex SDM [View Specs] micro topping and Ardex Concrete Guard Sealer[View Specs]

